بازیابی سرب و فلزات رنگین

تعرفه تبلیغات در سایت
عنوان عکس
عنوان عکس
عنوان عکس
عنوان عکس
عنوان عکس

 

 




 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 




 

نویسنده : اکـــــــــبر خوشـــــــــفکر -09123109930 بازدید : 286 تاريخ : پنجشنبه 18 ارديبهشت 1393 ساعت: 12:44
برچسب‌ها :

 

 

نویسنده : اکـــــــــبر خوشـــــــــفکر -09123109930 بازدید : 344 تاريخ : جمعه 28 تير 1392 ساعت: 16:34
برچسب‌ها :

 

 

 

نویسنده : اکـــــــــبر خوشـــــــــفکر -09123109930 بازدید : 235 تاريخ : جمعه 28 تير 1392 ساعت: 16:44
برچسب‌ها :

نویسنده : اکـــــــــبر خوشـــــــــفکر -09123109930 بازدید : 224 تاريخ : جمعه 28 تير 1392 ساعت: 16:52
برچسب‌ها :

 

 

  EDUCATION:

 

1-Bachelor’s Degree in Industrial Engineering (Industrial Technology Branch)

2-Associate(master diploma) Degree in Metallurgy

 

WORK DESCRIPTION:

 

1-Has worked in a Battery Company for 20 years as a manager of Lead Production in metal melting and  Lead production.(lead recycling)

2-Has worked in research department for 2 years in battery company (lead recycling)

3-has worked in zinc alloying production (zamak) private company for 2 years

4-Has worked in copper production (copper refining) private company for 2 years

5-Has worked in UNIQE METAL TECHNOLOGIESE CO.(jabel ali – UAE) for 2 years as a production manager of lead recycling battery.

 

On-the-job trainings received:

1-Training course in blast furnace lead recycling for 3 months in jungfer battery tech. co. in Austria

2-Traning course in ISO

3-Training course in German language at gute institute

4- Training course in management & factory management

5-Computer course including Windows and Internet.

 

The summary of my experiences in production activities and the projects:

 

1 - Design, construction, and installation, and training of the copper plant in the Mes Karan Company that included these sections:

a) Two converter furnace and anode furnace with a capacity of 20 tons per day.

b) Anod casting system with a hydraulic dye ejector

c) A jet pulse bag filter with a capacity of 65,000 m3fh

2 - Design, construction and installation, and training of a lead refining plant in Behin A var Company including:

a)Two 15-ton lead kettles

b)Pump and agitators fitted with the above-mentioned kettles

c)Manual ingot casting system

d)A vibrating filter system for the red lead production line

3 - Design, construction, and installation, and training of the lead refining plant in the Mehr Taban Nour Company including sections as follows:

 

a)Two 2S-ton lead kettles

b)Pump and agitators fitted with the above-mentioned kettels

c)A oxidation device for the oxidation of lead

d)Manual ingot casting system and designing the pig-bed

 

4 - Design, construction, and installation a saw for tearing batteries with a capacity of 6 ton/h for the Mehr Taban Nour Company

5 - Design, construction and installation of a saw cutting machine for batteries with a capacity of 6 Ton/h for Zanjan Lead and Zinc Company(NILZ).

6 - Design, construction and installation, and training of the production and refining lead for the Ghom Alloy Company including these sections

a) Two 23-ton lead kettles

b) Two 10-ton lead kettles

c) Automatic teeming system with a capacity of 7-8 Ton/Hr of Lead pig (casting machine)

d) A vibrating filter(baghouse) with a capacity of 20,000 m³/hr for lead production line

e) A vibrating filter(baghouse)  with a capacity of 8,000 m³/hr for the Zamac production line

f) three agitators of molten lead and two molten lead pumps and an oxidation device

g) Design, construction and installation of bag house filter with a capacity of 40,000 m³/hr with an afterburner machine and a cooling tower as well as required accessories.

7- Construction of a rotary furnace with a capacity of 40 ton/day of lead for a state-owned company

8- Constructing and setting in motion the compressed air system with screw compressor for Behinavar, Ghom Alloy and Mehr Taban Nour companies.

9- Design and construction of water jacket burners of rotary furnace

10-full study in production line of fine (pure) lead &doing the same production for the 1st  time in 1988 within industrial class (NIRU CO.)

11- Making research on and preparing alloys of lead-calcium, lead-selenium, lead-arsenic and different lead alloys

12- Design and construction of a fully automatic aluminum ingot casting system similar to T.Master brand(casting machine)

13- Design, construction and installation, and training of the production and refining lead

And smelting for the rangin alloy pars co. including these section(in the presses at this time):

 

       a) Two 25-ton lead kettles

 

       b) Pump and agitators fitted with the above-mentioned kettles

c) Automatic ingot casting system with a capacity of 7-8 Ton/Hr of Lead pig (casting machine)

d) one 10 tons capacity short rotary furnace for lead smelting

e)  one saw mchine for tearing batteries with a capacity of 6 ton/h

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

نویسنده : اکـــــــــبر خوشـــــــــفکر -09123109930 بازدید : 364 تاريخ : پنجشنبه 18 ارديبهشت 1393 ساعت: 12:51
برچسب‌ها :